Cellnex, Europe’s largest telecom towers and infrastructure operator, has deployed a multi-operator cellular protection resolution alongside 3.5 km of Barcelona’s shoreline, from Sant Sebastia to Mar Bella seashore. The deployment goals to boost 5G protection in preparation for the thirty seventh America’s Cup, a world sporting occasion operating from August 22 to October 27.
Additionally Learn: Frog Cellsat Implements OneDAS System at Lucknow Airport
DAS Put in on Metropolis Infrastructure
As a part of an settlement with the Barcelona Metropolis Council, Cellnex has put in a distributed antenna system (DAS) on the council’s bodily buildings and road fittings alongside the town’s seashores to serve the tens of hundreds of holiday makers all year long.
Everlasting Infrastructure
The infrastructure will stay in place on the town’s shoreline after the sporting occasion ends subsequent month. “The infrastructure has been designed to stay completely after the occasion,” Cellnex mentioned.
Commenting on the deployment, Cellnex Spain famous, “DAS techniques reinforce the connectivity of any cellular operator in areas with a excessive inflow of individuals, such because the Barcelona shoreline. We’re additionally deploying such options in city facilities, stadiums, procuring facilities, massive buildings, networks, and metro stations, amongst different places. This enables us to increase and densify the community’s capability to supply the general public with dependable connectivity always.”
Additionally Learn: Cellnex Portugal Plans Acquisition of Six Telecom Towers from NOS Know-how
Cellnex Footprint
Cellnex manages a portfolio of greater than 138,000 websites, together with projected rollouts by means of 2030, throughout 12 European international locations, with a major presence in Spain, France, the UK, Italy, and Poland.